The Asta Powerproject Insider’s Guide
Everything we know about Asta Powerproject in one document: what it costs, its grades, getting a refund, getting help and what else to look at. Read it here, or keep a copy.
Asta Powerproject
The Insider’s Guide
Gantt-based planning software built for construction projects
Every plan, grade, refund rule and rival among project management tools, read from Asta Powerproject’s own pages.
Made by Eleco Software Limited · checked Nov 13, 2026 · toolgpa.com
Contents
- 01WelcomeWhat it is, who it suits, its grades and the ten things to know first
- 02What it costsEvery plan, the free plan, ways to pay less and how prices have moved
- 03What it doesIts main features, where it runs, what it works with and who makes it
- 04Where it standsIts grades against its category, and whether to keep it or make your own
- 05The alternativesThe tools it is most often weighed against, side by side
- 06Quick answersThe questions people ask about it, each answered in a line or two
- 07About ToolGPAWho made this guide, what else is on the site, and how to cite it
ToolGPA put this guide together from Asta Powerproject’s own pages, its app-store listings and our grades. Every fact in it is on Asta Powerproject’s page too, where it is kept up to date. Checked Nov 13, 2026.
Part 01 · Overview
Welcome
What it is, who it suits, its grades and the ten things to know first
1.8
GPA, above 7 of the 149 other project management tools we grade
Asta Powerproject is a planning and scheduling application from Eleco, built mainly for construction and infrastructure projects. It offers Gantt scheduling with critical path analysis, resource and cost management, scenario planning and 4D BIM integration. A multi-user Enterprise edition shares programmes across teams and portfolios.
To get you started, here are 9 things to know about Asta Powerproject, taken from its own pages and our grades.
Construction scheduling software takes training.
- 1
Best for construction planners who need Gantt programmes
Asta Powerproject is Gantt-based planning software for construction, with 4D BIM, resource and cost management.
- 2
Paid plans start at about $170.84 a month for each person
As its pricing page puts it: £1,530 per licence / year, VAT included, UK shop price.
- 3
You can try it first
14-day free trial download
- 4
It runs on 3 platforms
Windows, iOS and Android.
- 5
Gantt scheduling
Tasks are drawn and linked inside the Gantt chart for critical path analysis, with codes, calendars, resources and costs assigned there too.
- 6
4D BIM integration
The product page lists 4D BIM integration, which ties the schedule to a building model for visual planning.
- 7
Resource and cost management
Resources are allocated across projects, and planned spend is compared with actual spend to forecast costs.
- 8
A 1.8 GPA, above 7 of 149
That is against the other project management tools we grade, on value, the free plan, features, ease of use and platforms.
- 9
Keep it
The plain part of Asta Powerproject you could make: Gantt & timelines and reports. What surrounds it you could not. The 3 things listed below take a company, not a weekend.
Asta Powerproject at a glance
- Pricing
- Free trial, from £1,530 per licence / year, VAT included, UK shop price
- Free plan
- No
- Free trial
- 14-day free trial download
- Runs on
- Windows, iOS, Android
- Made by
- Eleco Software Limited
- Category
- Project Management
- Our grade
- 1.8 GPA, weak
The report card
Best for construction planners who need Gantt programmes
Asta Powerproject is Gantt-based planning software for construction, with 4D BIM, resource and cost management. It costs £1,530 per licence a year including VAT, runs on Windows, and the phone app is licensed separately.
| Subject | Grade | Comment |
|---|---|---|
| Value for money | D | £1,530 per licence a year with UK VAT, about £128 a month, far above the dearest tenth of the category. It is a specialist tool, but the figure is the UK shop price. |
| Free plan and trial | D | 14-day free trial download, no free plan, and card terms are not stated. |
| Features | C | Gantt scheduling, 4D BIM, resources, costs and scenario planning. It does the construction planning job fully, which is a narrower job than general project management. |
| Ease of use | C | No store rating on record. Construction scheduling software takes training. |
| Platforms and integrations | B | Windows desktop with iOS and Android apps, which are licensed separately. Mac use needs the SaaS edition. |
An A is worth 4 points, a B 3, a C 2, a D 1 and an F nothing. The GPA is the average of the five.
Who Asta Powerproject is for
- Fits if you plan construction programmes and need 4D BIM links
- Works for contractors who want a free viewer for colleagues
Who it is not for
- Pricey if you are a small team, as one licence is £1,530 a year with VAT
- Not for you if you use a Mac, as the desktop software is Windows only and Mac needs the SaaS edition
- Watch out: the iOS and Android app is licensed separately
- Watch out: the price read is the UK shop's in pounds, and Enterprise has no published price
- Skip it if you want a free plan, as only a 14-day trial is listed
Good to know
Good for
- Construction planners and schedulers who work in Gantt charts
- Contractors that want 4D BIM linked to the programme
- Organizations choosing single-user, concurrent or cloud licensing
Worth knowing
- The desktop software runs on Windows PC; Mac use needs the SaaS edition.
- The iOS and Android companion app is licensed separately.
- The price read is the UK shop's GBP figure with VAT; US and other-country prices were not seen.
- Enterprise has no published price, and licences are single-user, concurrent or SaaS.
Part 02 · Pricing
What it costs
Every plan, the free plan, ways to pay less and how prices have moved
~$170.84
A month to start, for each person
Asta Powerproject is a paid product with a free trial, starting at £1,530 per licence / year, VAT included, UK shop price.
It is a specialist tool, but the figure is the UK shop price.
Annual Subscription
£1,530
per licence / year, billed annually, VAT included
One user per licence on Windows PC, with 14-day activation support. Buying 2 licences gets 5% off. UK shop price in GBP.
Enterprise
Custom
Shared real-time access to projects, shared resources and visibility across all projects; contact the team or a reseller.
Trying it first
14-day free trial download
Read from shop.eleco.com on Nov 13, 2026.
Part 03 · Features
What it does
Its main features, where it runs, what it works with and who makes it
3
Places it runs: Windows, iOS and Android
Gantt-based planning software built for construction projects. Here is what it does, as its own site describes it, and what it covers: Gantt & timelines, reports, dashboards.
It does the construction planning job fully, which is a narrower job than general project management.
- Gantt scheduling
- Tasks are drawn and linked inside the Gantt chart for critical path analysis, with codes, calendars, resources and costs assigned there too.
- 4D BIM integration
- The product page lists 4D BIM integration, which ties the schedule to a building model for visual planning.
- Resource and cost management
- Resources are allocated across projects, and planned spend is compared with actual spend to forecast costs.
- Scenario planning and reporting
- Scenarios are compared for profit, and dashboards and reports are produced for stakeholders.
- Enterprise collaboration
- Asta Enterprise lets several users work in the same programme at once, with organization-wide views of schedules, resourcing and costs.
- Free ProjectViewer
- Stakeholders can open a project in the free ProjectViewer without holding a licence.
Where it runs
- Windows
- iOS
- Android
What it works with
Its own pages name no integrations.
Asta Powerproject is made by Eleco Software Limited.
Part 04 · Standing
Where it stands
Its grades against its category, and whether to keep it or make your own
7/149
Other project management tools it is graded above
Asta Powerproject's GPA of 1.8 is higher than 7 of the 149 other project management tools we grade, and level with 6.
It stands best on platforms and integrations (B, above 26 of 149) and worst on value for money (D, above 1).
Its paid plans start at about $170.84 a month for each person, against a middle price of $9 for the category: 120 of the 121 others that charge start lower.
On features, ease of use and platforms it scores 2.3 out of 4. 65 tools score higher and cost less.
Each grade against the category
Every bar is all 150 project management tools we grade, cut by the letter each got. Asta Powerproject’s own letter is outlined.
- DValue for moneyAbove 1 of 149
- DFree plan and trialAbove 13 of 149
- CFeaturesAbove 2 of 149
- CEase of useAbove 7 of 149
- BPlatforms and integrationsAbove 26 of 149
Price against what you get
Each dot is one of 128 project management tools. Further left costs less; higher up scores better on features, ease of use and platforms. Asta Powerproject is the marked dot.
What paid plans start at, a month (each step along is roughly double) →
Keep it, or make your own?
Whether this is something you could build for yourself with an AI app builder, and what you would give up.
Keep it
The plain part of Asta Powerproject you could make: Gantt & timelines and reports. What surrounds it you could not. The 3 things listed below take a company, not a weekend.
That makes this kind of software worth paying for, not this one in particular: 136 of the 149 other project management tools grade higher. It costs $2,050.03 a year.
What you could make
- Gantt & timelines and reports: an app builder makes these well.
What you could not
- Connections that pull numbers from dozens of other services.
- Apps for Windows, iOS and Android that stay in step with each other.
- It is priced for each person, which means accounts and billing for a team.
What this rests on. Asta Powerproject’s listing: what it does, where it runs, what it plugs into and what it costs. It is a judgement about the kind of software this is. We have not built a replacement for it, and making your own means looking after it too. How we decide, and every tool’s verdict.
Part 05 · Alternatives
The alternatives
The tools it is most often weighed against, side by side
Microsoft Project, GanttPRO, Planview, Merlin Project and ProjectLibre
The 5 tools Asta Powerproject is most often weighed against, with where each one differs from it.
- 1.6GPA
Microsoft Project
Free trial · from $30.00/mo
Desktop project scheduling for Windows with Gantt charts.
- Only Asta Powerproject lists iOS and Android apps.
- Microsoft Project can be bought with a one-time purchase.
- Asta Powerproject also covers dashboards.
- 2.2GPA
GanttPRO
Free trial · from $8/mo
Online Gantt chart maker for planning and tracking projects.
- Only Asta Powerproject lists a Windows app.
- Only GanttPRO lists a web app.
- Asta Powerproject also covers reports and dashboards.
- 1.8GPA
Planview
Paid
Enterprise portfolio management and connected work platform.
- Only Asta Powerproject lists Windows, iOS and Android apps.
- Only Planview lists a web app.
- Asta Powerproject also covers Gantt & timelines.
- 2.0GPA
Merlin Project
Free trial · from $6.99/mo
Offline Mac and iPad project planner with Gantt, Kanban and mind maps.
- Only Asta Powerproject lists Windows and Android apps.
- Only Merlin Project lists a macOS app.
- Asta Powerproject also covers reports and dashboards.
- 3.2GPA
ProjectLibre
Free plan · from $9.99/mo
Microsoft Project-compatible scheduling: free desktop app, paid cloud.
- ProjectLibre has a free plan. Asta Powerproject does not, though it has a free trial.
- Only Asta Powerproject lists iOS and Android apps.
- Only ProjectLibre lists a web app.
Part 06 · Questions
Quick answers
The questions people ask about it, each answered in a line or two
11
Questions, each answered in a line or two
The short version of everything above, for when you only need the answer. Each one is told in full in its part of the guide.
Is Asta Powerproject free?
No, Asta Powerproject is a paid product, but you can try it first. 14-day free trial download.
How much does Asta Powerproject cost?
Asta Powerproject lists 2 plans. Annual Subscription: £1,530 per licence / year, billed annually, VAT included.
What platforms does Asta Powerproject work on?
Asta Powerproject is available on Windows, iOS and Android.
Does Asta Powerproject have a macOS app?
No macOS app was listed when its pages were read on Nov 13, 2026. Asta Powerproject is listed for Windows, iOS and Android.
Does Asta Powerproject have a Linux app?
No Linux app was listed when its pages were read on Nov 13, 2026. Asta Powerproject is listed for Windows, iOS and Android.
Is Asta Powerproject open source?
Asta Powerproject is not described as open source on its own site, as read on Nov 13, 2026.
Who makes Asta Powerproject?
Asta Powerproject is made by Eleco Software Limited.
What are the alternatives to Asta Powerproject?
The closest alternatives to Asta Powerproject in our directory are Microsoft Project, GanttPRO, Planview, Merlin Project and ProjectLibre.
How does Asta Powerproject compare with other project management tools?
Asta Powerproject's GPA of 1.8 is higher than 7 of the 149 other project management tools we grade, and level with 6.
Is Asta Powerproject good value for money?
ToolGPA grades Asta Powerproject D for value for money. Its paid plans start at about $170.84 a month for each person, against a middle price of $9 for the category: 120 of the 121 others that charge start lower.
Could I make my own version of Asta Powerproject?
The plain part of Asta Powerproject you could make: Gantt & timelines and reports.
Where this guide comes from
The prices, plans, platforms and features were read from Asta Powerproject’s own pages on Nov 13, 2026, and the grades were given on Nov 13, 2026. Graded from this listing, whose facts were read from Eleco Software Limited's own pages on 13 November 2026. Not based on using the product, and shorter than our full reviews.
Every tool we list gets five grades, A to F, each with its reason, and a GPA that averages them. How each is decided is at toolgpa.com/grades. This guide is ToolGPA’s own work; it is not made, paid for or approved by Eleco Software Limited. Prices change, so check eleco.com before you buy.
Part 07 · About
About ToolGPA
Who made this guide, what else is on the site, and how to cite it
7,721
Tools graded, in 95 categories
ToolGPA grades software the way a school report grades a pupil: five subjects, a letter for each with the reason written beside it, and a GPA that averages them. Prices, plans and platforms are read from each maker’s own pages and dated, so you always know how fresh a figure is.
Every grade, review and ranking on ToolGPA is our own judgement. No company can pay for a grade or change one. Every tool on the site has a guide like this one, free to download and pass on. It all lives at toolgpa.com.
7,721
tools graded
95
categories
739
price changes on record
579
apps priced in 12 countries
What else is on toolgpa.com
- Asta Powerproject, kept up to dateEverything in this guide, with prices and grades as they are todaytoolgpa.com/tools/asta-powerproject
- How grades are givenThe rules behind every letter and every GPAtoolgpa.com/grades
- Value chartsWhat each tool costs against what it scores, for every categorytoolgpa.com/charts
- CompareAny two tools side by side, plan by plantoolgpa.com/compare
- Price changesEvery price rise and cut on record, each with its sourcetoolgpa.com/price-changes
- Prices by countryWhat apps cost on the App Store in 12 countriestoolgpa.com/prices-by-country
- Pay lessEvery public discount: yearly billing, students, nonprofitstoolgpa.com/save
- Keep or makeWhich tools are worth paying for, and which you could build yourselftoolgpa.com/keep-or-make
Scan for the live page
Prices and grades as they are today
Quoting this guide?
Please name ToolGPA and link to the live page, so readers can check the figures for themselves:
ToolGPA, "Asta Powerproject: The Insider's Guide", checked Nov 13, 2026. https://toolgpa.com/tools/asta-powerproject
Know someone choosing between project management tools?
Send them this guide: toolgpa.com/tools/asta-powerproject/guide
ToolGPA elsewhere: youtube.com/@toolgpa
See our other guides
The best-graded project management tools after Asta Powerproject, each with an Insider's Guide of its own.
- Project Management Insider's GuideEvery one of the 150 project management tools we grade, compared
- GitHub Issues Insider's GuideIssue tracking and project planning built into GitHub3.4 GPA
- Freedcamp Insider's GuideProject management suite with a free plan for unlimited users3.2 GPA
- Huly Insider's GuideOpen-source project management with chat, docs and video calls3.2 GPA
Choosing software? Every tool graded, every price dated.
Compare tools at toolgpa.com ›Everything in this guide is ToolGPA’s own summary of what Asta Powerproject’s pages, its app-store listings and public reviews said on the dates shown. Grades are our judgement under the rules at toolgpa.com/grades. Every grade, review and ranking on ToolGPA is our own judgement. No company can pay for a grade or change one. Asta Powerproject is a trademark of its owner, and this guide is not made, paid for or approved by Eleco Software Limited. Prices and plans change: check eleco.com before you buy.




