Asta Powerproject review (2026): is it worth £1,530 a year?

Gantt-based planning software built for construction projects

Free trial · from £1,530/yrProject ManagementChecked Nov 13, 2026 · graded Nov 13, 2026 by ToolGPA

Black Friday: is there a Asta Powerproject sale?

Asta Powerproject report card

1.8GPA

Weak · out of 4.0 · graded Nov 13, 2026

Best for construction planners who need Gantt programmes

Asta Powerproject is Gantt-based planning software for construction, with 4D BIM, resource and cost management. It costs £1,530 per licence a year including VAT, runs on Windows, and the phone app is licensed separately.

Who Asta Powerproject is for

  • Fits if you plan construction programmes and need 4D BIM links
  • Works for contractors who want a free viewer for colleagues

Who Asta Powerproject is not for

  • Pricey if you are a small team, as one licence is £1,530 a year with VAT
  • Not for you if you use a Mac, as the desktop software is Windows only and Mac needs the SaaS edition
  • Watch out: the iOS and Android app is licensed separately
  • Watch out: the price read is the UK shop's in pounds, and Enterprise has no published price
  • Skip it if you want a free plan, as only a 14-day trial is listed
See the alternatives

Why Asta Powerproject gets a 1.8

Five grades, each with its reason. The GPA is their average: an A is 4 points, an F is none.

  • DValue for money£1,530 per licence a year with UK VAT, about £128 a month, far above the dearest tenth of the category. It is a specialist tool, but the figure is the UK shop price.
  • DFree plan and trial14-day free trial download, no free plan, and card terms are not stated.
  • CFeaturesGantt scheduling, 4D BIM, resources, costs and scenario planning. It does the construction planning job fully, which is a narrower job than general project management.
  • CEase of useNo store rating on record. Construction scheduling software takes training.
  • BPlatforms and integrationsWindows desktop with iOS and Android apps, which are licensed separately. Mac use needs the SaaS edition.

What these grades rest on. Graded from this listing, whose facts were read from Eleco Software Limited's own pages on 13 November 2026. Not based on using the product, and shorter than our full reviews. How we review and grade.

Make Asta Powerproject? Put this grade on your site
Asta Powerproject: 1.8 GPA on ToolGPA

Paste this where you want the badge. It links here and follows the grade if it changes. About badges

<a href="https://toolgpa.com/tools/asta-powerproject#review"><img src="https://toolgpa.com/badge/asta-powerproject.svg" alt="Asta Powerproject: 1.8 GPA on ToolGPA" width="196" height="56"></a>

Where Asta Powerproject stands among project management tools

Asta Powerproject's GPA of 1.8 is higher than 7 of the 149 other project management tools we grade, and level with 6.

It stands best on platforms and integrations (B, above 26 of 149) and worst on value for money (D, above 1).

Its paid plans start at about $170.84 a month for each person, against a middle price of $9 for the category: 120 of the 121 others that charge start lower.

On features, ease of use and platforms it scores 2.3 out of 4. 65 tools score higher and cost less.

Each grade against the category

Every bar is all 150 project management tools we grade, cut by the letter each got. Asta Powerproject’s own letter is outlined.

  • DValue for moneyAbove 1 of 149, level with 33
  • DFree plan and trialAbove 13 of 149, level with 12
  • CFeaturesAbove 2 of 149, level with 73
  • CEase of useAbove 7 of 149, level with 126
  • BPlatforms and integrationsAbove 26 of 149, level with 95

Price against what you get

Each dot is one of 128 project management tools. Further left costs less, and higher up scores better on features, ease of use and platforms. Point at a dot to see which tool it is.

Features, ease of use and platforms, averaged

D1.0C2.0B3.0A4.0Free$1$2$5$10$20$50$100$200$500$1kMore for lessCosts more, scores moreCosts less, scores lessCosts more, scores lessAsta Powerproject

What paid plans start at, a month (each step along is roughly double) →

  • The best score at each price
  • Has a free plan
  • No free plan
The full chart, and the best project management tools at every price

Keep Asta Powerproject, or make your own?

Keep it

The plain part of Asta Powerproject you could make: Gantt & timelines and reports. What surrounds it you could not. The 3 things listed below take a company, not a weekend.

That makes this kind of software worth paying for, not this one in particular: 136 of the 149 other project management tools grade higher. It costs $2,050.03 a year.

What you could make

  • Gantt & timelines and reports: an app builder makes these well.

What you could not

  • Connections that pull numbers from dozens of other services.
  • Apps for Windows, iOS and Android that stay in step with each other.
  • It is priced for each person, which means accounts and billing for a team.

What this rests on. Asta Powerproject’s listing: what it does, where it runs, what it plugs into and what it costs. It is a judgement about the kind of software this is. We have not built a replacement for it, and making your own means looking after it too. How we decide, and every tool’s verdict.

What is Asta Powerproject?

Asta Powerproject is a planning and scheduling application from Eleco, built mainly for construction and infrastructure projects. It offers Gantt scheduling with critical path analysis, resource and cost management, scenario planning and 4D BIM integration. A multi-user Enterprise edition shares programmes across teams and portfolios.

Worth knowing

  • The desktop software runs on Windows PC; Mac use needs the SaaS edition.
  • The iOS and Android companion app is licensed separately.
  • The price read is the UK shop's GBP figure with VAT; US and other-country prices were not seen.
  • Enterprise has no published price, and licences are single-user, concurrent or SaaS.

Key features

Gantt scheduling
Tasks are drawn and linked inside the Gantt chart for critical path analysis, with codes, calendars, resources and costs assigned there too.
4D BIM integration
The product page lists 4D BIM integration, which ties the schedule to a building model for visual planning.
Resource and cost management
Resources are allocated across projects, and planned spend is compared with actual spend to forecast costs.
Scenario planning and reporting
Scenarios are compared for profit, and dashboards and reports are produced for stakeholders.
Enterprise collaboration
Asta Enterprise lets several users work in the same programme at once, with organization-wide views of schedules, resourcing and costs.
Free ProjectViewer
Stakeholders can open a project in the free ProjectViewer without holding a licence.

Asta Powerproject pricing

As of Nov 13, 2026, Asta Powerproject is a paid product with a free trial, starting at £1,530 per licence / year, VAT included, UK shop price.

Starts at
£1,530 per licence / year, VAT included, UK shop price
Free plan
None
Free trial
14-day free trial download
Annual Subscription£1,530per licence / year, billed annually, VAT includedOne user per licence on Windows PC, with 14-day activation support. Buying 2 licences gets 5% off. UK shop price in GBP.
EnterpriseCustomShared real-time access to projects, shared resources and visibility across all projects; contact the team or a reseller.

Read from shop.eleco.com on Nov 13, 2026. Prices change, so confirm with Asta Powerproject before you buy.

Pricing in detail

Asta Powerproject alternatives

Common questions

Does Asta Powerproject have a macOS app?

No macOS app was listed when its pages were read on Nov 13, 2026. Asta Powerproject is listed for Windows, iOS and Android.

Does Asta Powerproject have a Linux app?

No Linux app was listed when its pages were read on Nov 13, 2026. Asta Powerproject is listed for Windows, iOS and Android.

Is Asta Powerproject open source?

Asta Powerproject is not described as open source on its own site, as read on Nov 13, 2026.

Sources for this page

The prices, plans, platforms and features above were read from these pages on Nov 13, 2026.