Skip to content

Asta Powerproject vs GanttPRO (2026): which should you pick?

As of Nov 13, 2026, GanttPRO grades higher than Asta Powerproject: 2.2 against 1.8 out of 4.0.

Checked Oct 5, 2026 and Nov 13, 2026 · graded Oct 10, 2026 and Nov 13, 2026 by ToolGPA

GanttPRO grades higher on value for money and the free plan. They get the same grade on features, ease of use and platforms.

Price, platforms and features side by side. The table says where each price was read and when.

Asta Powerproject

Gantt-based planning software built for construction projects

Free trial · from £1,530/yr

GanttPRO

Online Gantt chart maker for planning and tracking projects

Free trial · from $8/mo

Which one is for you

Pick Asta Powerproject if

  • Fits if you plan construction programmes and need 4D BIM links
  • Works for contractors who want a free viewer for colleagues

Look elsewhere if

  • Pricey if you are a small team, as one licence is £1,530 a year with VAT
  • Not for you if you use a Mac, as the desktop software is Windows only and Mac needs the SaaS edition
  • Watch out: the iOS and Android app is licensed separately
  • Watch out: the price read is the UK shop's in pounds, and Enterprise has no published price
  • Skip it if you want a free plan, as only a 14-day trial is listed

Pick GanttPRO if

  • Fits if you plan with dependencies, baselines and a critical path
  • Works for teams of 20 or more, who pay $1 to $2 less per user on annual billing

Look elsewhere if

  • Not for you if you want to stay free, as there's no free plan once the 14-day trial ends
  • Pricey if you need workload, budgets, time tracking, reports, Jira Cloud or the API, which all sit on Business at $19 a user
  • Skip it if you work alone and want to pay monthly, since single-user accounts are annual only
  • Tight if you need single sign-on or custom roles, as Enterprise needs at least 5 users on an annual plan
  • Watch out: storage is 1 GB per user below Enterprise, there's no desktop app, and nothing can be edited offline

How we grade them

1.8GPAAsta PowerprojectWeak2.2GPAGanttPROFair
Value for money
D£1,530 per licence a year with UK VAT, about £128 a month, far above the dearest tenth of the category. It is a specialist tool, but the figure is the UK shop price.
CCore is $8 a user a month billed annually, $9 monthly, which is exactly the middle price in this category, and $7 from 20 users. Ordinary, then. Mind the ladder above it: custom fields need Advanced at $12, and workload, budgets, time tracking and the API need Business at $19.
Free plan and trial
D14-day free trial download, no free plan, and card terms are not stated.
CNo free plan at all. There's a 14-day trial with everything switched on and no card asked for, and then you subscribe. On your own you can only buy it annually.
Features
CGantt scheduling, 4D BIM, resources, costs and scenario planning. It does the construction planning job fully, which is a narrower job than general project management.
CThe Gantt side is done fully: dependencies, auto scheduling, critical path, baselines, milestones, plus board, list and dashboard views and export to PDF, PNG, XLSX and XML. But that is the narrower half of running a project, and workload, portfolio, budgets, reports and time logs all need Business.
Ease of use
CNo store rating on record. Construction scheduling software takes training.
CNo store rating on record. This is a tool where the work is building the plan itself, task by task, with dependencies to wire up, so there's a learning curve. The AI chart maker on every plan at least gives you a first draft to push around.
Platforms and integrations
BWindows desktop with iOS and Android apps, which are licensed separately. Mac use needs the SaaS edition.
BWeb, iPhone and Android, with no desktop app on record. It connects to Teams, Slack, Google Drive, OneDrive, Google Calendar and Outlook Calendar, though Jira Cloud and the API wait for Business.
Best forconstruction planners who need Gantt programmesplanning projects on a Gantt chart

The GPA is the average of the five grades: an A is 4 points, an F is none. The full reasons are on each tool's page: Asta Powerproject and GanttPRO. How we grade

Price against what you get

Asta Powerproject starts at about $170.84 a month for each person and scores 2.3 out of 4 on features, ease of use and platforms. GanttPRO starts at $8 a month for each person and scores 2.3.

They score the same, and GanttPRO starts $162.84 a month lower. Of the other project management tools on the chart, 65 score higher than Asta Powerproject for less, and 25 score higher than GanttPRO for less.

Features, ease of use and platforms, averaged

D1.0C2.0B3.0A4.0Free$1$2$5$10$20$50$100$200$500$1kMore for lessCosts more, scores moreCosts less, scores lessCosts more, scores lessAsta PowerprojectGanttPRO

What paid plans start at, a month (each step along is roughly double) →

  • The best score at each price
  • Has a free plan
  • No free plan
The full chart of project management tools, and the best at every price

Where they differ

  • Asta Powerproject also covers reports and dashboards.
  • GanttPRO also covers tasks, kanban boards and time tracking.
In commoniOSAndroidGantt & timelines

At a glance

Asta PowerprojectGanttPRO
PricingFree trialFree trial
Starts at£1,530 per licence / year, VAT included, UK shop price$8 per user / month, billed annually ($7 from 20 users)
Free planNoneNone
Free trial14-day free trial download14-day free trial with full features, no credit card required
Web
Windows
iOS
Android
Made byEleco Software LimitedDPM Solutions Sp. z o.o.
Price read fromshop.eleco.comganttpro.com
CheckedNov 13, 2026Oct 5, 2026

Worth knowing

Asta Powerproject

  • The desktop software runs on Windows PC; Mac use needs the SaaS edition.
  • The iOS and Android companion app is licensed separately.
  • The price read is the UK shop's GBP figure with VAT; US and other-country prices were not seen.
  • Enterprise has no published price, and licences are single-user, concurrent or SaaS.

GanttPRO

  • There is no free plan: a subscription is needed after the 14-day trial, and single-user accounts are sold on annual billing only.
  • Workload, portfolio view, time tracking, budgets, reports, the Jira Cloud integration and the API all need the Business plan.
  • SAML SSO and custom roles need Enterprise, which requires at least 5 users and an annual subscription.
  • Storage is 1 GB per user on Core, Advanced and Business. Data cannot be edited offline.

Key features

Asta Powerproject

Gantt scheduling
Tasks are drawn and linked inside the Gantt chart for critical path analysis, with codes, calendars, resources and costs assigned there too.
4D BIM integration
The product page lists 4D BIM integration, which ties the schedule to a building model for visual planning.
Resource and cost management
Resources are allocated across projects, and planned spend is compared with actual spend to forecast costs.
Scenario planning and reporting
Scenarios are compared for profit, and dashboards and reports are produced for stakeholders.
Enterprise collaboration
Asta Enterprise lets several users work in the same programme at once, with organization-wide views of schedules, resourcing and costs.
Free ProjectViewer
Stakeholders can open a project in the free ProjectViewer without holding a licence.

GanttPRO

Gantt charts with auto scheduling
Tasks are linked by dependencies and rescheduled automatically when dates change. Critical path, baselines, milestones and deadlines are included on every plan.
Board, list and dashboard views
A project can be switched from the Gantt chart to a Kanban-style board, a list or a dashboard on any plan. Calendar view starts on Advanced, portfolio and workload views on Business.
Workload and budgets
The Business plan shows each person's workload so work can be reallocated, and adds resource calendars, cost estimation and budget planning.
Time logs and reports
On Business and Enterprise, people log actual time on tasks, and owners and admins build reports on logged time that can be grouped, filtered and exported to Excel.
AI Gantt chart maker
An AI tool that drafts a Gantt chart is included in all four plans, according to the pricing page.
Sharing and export
A private link shares a live or static view of the chart with people outside the team, and charts export to PDF, PNG, XLSX and XML.

Plans

Asta Powerproject

  • Annual Subscription£1,530

    per licence / year, billed annually, VAT included

    One user per licence on Windows PC, with 14-day activation support. Buying 2 licences gets 5% off. UK shop price in GBP.

  • EnterpriseCustom

    Shared real-time access to projects, shared resources and visibility across all projects; contact the team or a reseller.

GanttPRO

  • Core$8

    per user / month, billed annually ($9 billed monthly)

    Gantt charts with auto scheduling, critical path and baselines, board and list views, project calendar and virtual resources. $7 per user for 20 or more users.

  • Advanced$12

    per user / month, billed annually ($15 billed monthly)

    Adds overdue tasks, custom fields, saved filters, calendar view, calendar exceptions and custom project templates. $10 per user for 20 or more users.

  • Business$19

    per user / month, billed annually ($24 billed monthly)

    Adds workload and portfolio views, reports, budget planning, time tracking, Jira Cloud integration and the API. $17 per user for 20 or more users.

  • Enterprise$25

    per user / month, billed annually

    For 5 or more users on an annual subscription. Adds SAML SSO, custom roles and rights, onboarding help and unlimited storage. Shown as a limited offer, down from $35.

Ways to pay less

Asta Powerproject

No public discounts listed.

GanttPRO

  • Annual discount

    Up to 20% off with annual billing

    The pricing toggle advertises 20% off annual plans. For teams under 20, Core is $8 instead of $9 per user / month, Advanced $12 instead of $15 and Business $19 instead of $24.

  • Other savings

    Lower per-user rate from 20 users

    On annual billing, teams of 20 or more pay $7 for Core, $10 for Advanced and $17 for Business per user / month. From 40 members the page offers a custom quote.

  • Startups

    50% off the first annual plan for startups

    Startups incorporated less than 3 years ago that have raised no more than a Series B round can apply for 50% off their first annual subscription. Monthly billing is excluded.

  • Nonprofit

    50% off for nonprofits

    Healthcare, social care, non-governmental and educational nonprofits can apply for a 50% discount, submitting proof of eligibility for review.

  • Education

    50% off annual plans for education

    GanttPRO's pricing FAQ offers educational organizations, along with health-related and non-profit ones, 50% off any annual plan on request by email.

Common questions

Which is cheaper, Asta Powerproject or GanttPRO?

As of Nov 13, 2026, GanttPRO is cheaper to start with: $8 a month for each person, against about $170.84 a month for each person for Asta Powerproject. Asta Powerproject starts at £1,530 per licence / year, VAT included, UK shop price, and GanttPRO starts at $8 per user / month, billed annually ($7 from 20 users).

Which has a free plan, Asta Powerproject or GanttPRO?

As of Nov 13, 2026, neither Asta Powerproject nor GanttPRO has a free plan. Both have a free trial.

Which platforms do Asta Powerproject and GanttPRO run on?

As of Nov 13, 2026, only Asta Powerproject lists a Windows app and only GanttPRO lists a web app. Both list iOS and Android apps. A platform missing from a listing is one its maker's pages did not mention.

More comparisons

How this page was made

  • The verdict at the top follows a fixed rule. When both tools are in the same category and either is in our top three for it, the verdict follows that ranking: the higher-placed tool is our pick. The top three weigh who each tool suits as well as its grades, so a pick can go against the GPA. Otherwise the page does not pick one and says which grades higher: the higher GPA first; on a tie, the one with a free plan, then the one that starts cheaper in dollars a month, counted the same way for both; if they are still level, what the choice depends on.
  • The grades are our own, from each tool’s review or report card. The GPA is their average.
  • Prices, plans and platforms come from each tool’s listing. The table above says where each price was read and when.
  • The differences and the answers to the questions are worked out from those listings.
How we review and grade