Asta Powerproject vs Merlin Project (2026): which should you pick?
As of Nov 13, 2026, Merlin Project grades higher than Asta Powerproject: 2.0 against 1.8 out of 4.0.
Checked Oct 9, 2026 and Nov 13, 2026 · graded Oct 10, 2026 and Nov 13, 2026 by ToolGPA
Asta Powerproject grades higher on platforms. Merlin Project grades higher on the free plan and features. They get the same grade on value for money and ease of use.
Price, platforms and features side by side. The table says where each price was read and when.
Asta Powerproject
Gantt-based planning software built for construction projects
Merlin Project
Offline Mac and iPad project planner with Gantt, Kanban and mind maps
Which one is for you
Pick Asta Powerproject if
- Fits if you plan construction programmes and need 4D BIM links
- Works for contractors who want a free viewer for colleagues
Look elsewhere if
- Pricey if you are a small team, as one licence is £1,530 a year with VAT
- Not for you if you use a Mac, as the desktop software is Windows only and Mac needs the SaaS edition
- Watch out: the iOS and Android app is licensed separately
- Watch out: the price read is the UK shop's in pounds, and Enterprise has no published price
- Skip it if you want a free plan, as only a 14-day trial is listed
Pick Merlin Project if
- Fits if you manage projects on a Mac and want Gantt scheduling with baselines and earned value
- Works for planning offline, with project data kept on your own devices rather than a vendor's servers
Look elsewhere if
- Skip it if anyone on your team uses Windows or Android, as it's Apple devices only with no browser version
- Pricey if you want it on both Mac and iPad, because that's two subscriptions, $22.99 and $9.99 a month
- Not for you if you'd rather buy once, since it's subscription only with no perpetual license
- Watch out: Express at $6.99 leaves out Kanban, mind maps, baselines, earned value and team features
- Watch out: teams share files through iCloud Drive or Dropbox, as there's no vendor server
How we grade them
| 1.8GPAAsta PowerprojectWeak | 2.0GPAMerlin ProjectFair | |
|---|---|---|
| Value for money | D£1,530 per licence a year with UK VAT, about £128 a month, far above the dearest tenth of the category. It is a specialist tool, but the figure is the UK shop price. | DThe full Mac app is $22.99 a user a month, or $229.99 a year, which is in the dearest tenth of this whole category and nearly three times its middle price. The iPad and iPhone app is a separate $9.99 subscription with no bundle, and Express at $6.99 drops Kanban, mind maps and baselines. |
| Free plan and trial | D14-day free trial download, no free plan, and card terms are not stated. | CNo free plan. You get 30 days with every feature, 14 for Express, and after that the app turns into a free read-only viewer, so at least your files never lock you out. Editing means subscribing. |
| Features | CGantt scheduling, 4D BIM, resources, costs and scenario planning. It does the construction planning job fully, which is a narrower job than general project management. | BGantt scheduling with dependencies, milestones, slack times and a recalculating critical path, the same project as a Kanban board, mind map or workload view, resources, dynamic baselines and earned value, plus Microsoft Project XML in and out. There's no team server of its own. |
| Ease of use | CNo store rating on record. Construction scheduling software takes training. | CNo store rating on record. It installs like any Mac app and your files sit on your own devices, but baselines, slack times and earned value are not things you pick up in an afternoon. The AI assistant drafting a starting plan softens the first hour. |
| Platforms and integrations | BWindows desktop with iOS and Android apps, which are licensed separately. Mac use needs the SaaS edition. | CMac, iPad, iPhone and Apple Vision Pro, and nothing else: no Windows, no Android, no browser. Teams sync through iCloud Drive or Dropbox rather than a vendor server, and it swaps files with Microsoft Project, MindManager and FreeMind. |
| Best for | construction planners who need Gantt programmes | detailed project planning on a Mac |
The GPA is the average of the five grades: an A is 4 points, an F is none. The full reasons are on each tool's page: Asta Powerproject and Merlin Project. How we grade
Price against what you get
Asta Powerproject starts at about $170.84 a month for each person and scores 2.3 out of 4 on features, ease of use and platforms. Merlin Project starts at $6.99 a month for each person and scores 2.3.
They score the same, and Merlin Project starts $163.85 a month lower. Of the other project management tools on the chart, 65 score higher than Asta Powerproject for less, and 21 score higher than Merlin Project for less.
Features, ease of use and platforms, averaged
What paid plans start at, a month (each step along is roughly double) →
- The best score at each price
- Has a free plan
- No free plan
Where they differ
- Asta Powerproject also covers reports and dashboards.
- Merlin Project also covers kanban boards and mind mapping.
At a glance
| Asta Powerproject | Merlin Project | |
|---|---|---|
| Pricing | Free trial | Free trial |
| Starts at | £1,530 per licence / year, VAT included, UK shop price | $6.99 per user / month for the Express edition; full Mac app $22.99, iPad $9.99 |
| Free plan | None | None |
| Free trial | 14-day free trial download | 30-day free trial with every feature (14 days for Express); afterwards the app becomes a free read-only viewer. |
| macOS | ||
| Windows | ||
| iOS | ||
| Android | ||
| Made by | Eleco Software Limited | ProjectWizards GmbH |
| Price read from | shop.eleco.com | projectwizards.net |
| Checked | Nov 13, 2026 | Oct 9, 2026 |
Worth knowing
Asta Powerproject
- The desktop software runs on Windows PC; Mac use needs the SaaS edition.
- The iOS and Android companion app is licensed separately.
- The price read is the UK shop's GBP figure with VAT; US and other-country prices were not seen.
- Enterprise has no published price, and licences are single-user, concurrent or SaaS.
Merlin Project
- Runs only on Mac, iPad, iPhone and Apple Vision Pro; the vendor lists no Windows, Android or browser version.
- The Mac app and the iPad and iPhone app need separate subscriptions; the vendor offers no bundle.
- Subscription only: the vendor no longer sells a one-time or perpetual license.
- Merlin Project Express, the $6.99 edition, leaves out Kanban, mind maps, baselines, earned value and team features.
Key features
Asta Powerproject
- Gantt scheduling
- Tasks are drawn and linked inside the Gantt chart for critical path analysis, with codes, calendars, resources and costs assigned there too.
- 4D BIM integration
- The product page lists 4D BIM integration, which ties the schedule to a building model for visual planning.
- Resource and cost management
- Resources are allocated across projects, and planned spend is compared with actual spend to forecast costs.
- Scenario planning and reporting
- Scenarios are compared for profit, and dashboards and reports are produced for stakeholders.
- Enterprise collaboration
- Asta Enterprise lets several users work in the same programme at once, with organization-wide views of schedules, resourcing and costs.
- Free ProjectViewer
- Stakeholders can open a project in the free ProjectViewer without holding a licence.
Merlin Project
- Gantt chart and scheduling
- Link tasks with dependencies, set milestones and read slack times. The critical path recalculates as progress is entered.
- Kanban board and mind map
- The same project data can be shown as a Kanban board or a mind map, and moving a card or adding a branch updates the Gantt chart.
- Resources, baselines and earned value
- Assign people, materials, companies and equipment to tasks and see who is overbooked. The full app also has dynamic baselines and earned value analysis.
- Offline files with sync
- Projects are stored on the user's devices and work without a connection. Teams sync through iCloud Drive, Dropbox or other cloud storage, not a vendor server.
- AI project assistant
- Since version 9, an assistant generates a starting project structure with tasks, dependencies and resources from a short text description.
- Import and export
- Reads and writes Microsoft Project XML, MindManager, FreeMind, OPML, CSV and iCalendar files, imports OmniPlan files, and exports PDF, image and HTML reports.
Plans
Asta Powerproject
Annual Subscription£1,530
per licence / year, billed annually, VAT included
One user per licence on Windows PC, with 14-day activation support. Buying 2 licences gets 5% off. UK shop price in GBP.
EnterpriseCustom
Shared real-time access to projects, shared resources and visibility across all projects; contact the team or a reseller.
Merlin Project
Merlin Project Express$6.99
per user / month, or $69.99 per year
A separate, smaller Mac app with Gantt planning and resources. No Kanban, mind map, baselines or team features. App Store or Setapp only.
Merlin Project for iPad$9.99
per user / month, or $99.99 per year
The full app on iPad, iPhone and Apple Vision Pro. A separate subscription from the Mac app.
Merlin Project for Mac$22.99
per user / month, or $229.99 per year
The full Mac app with Gantt, Kanban, mind map, workload, baselines and earned value. Sold in the vendor's store and on the Mac App Store at the same price.
Ways to pay less
Asta Powerproject
No public discounts listed.
Merlin Project
- Annual discount
Two months free with yearly billing
The price list labels yearly billing as 2 months free: the Mac app is $229.99 a year against $22.99 a month, which comes to $275.88 over 12 months.
- Education
50% education discount on the Mac app
The purchasing FAQ gives students and educators 50% off Merlin Project for Mac in the vendor's own store on proof of status. It is not offered through the App Store.
- Nonprofit
50% off for nonprofits and charities
Nonprofits and charities that send proof of status get 50% off the Mac list price in the vendor's store. Churches and clerical organizations are excluded.
- Other savings
Volume discount from 10 licenses
Mac subscriptions bought in the vendor's store get 5% off from 10 licenses, rising in steps to 30% from 100 licenses. It cannot be combined with other discounts.
- Other savings
Family Sharing on App Store subscriptions
A subscription bought through the App Store can be shared with up to five other family members through Apple's Family Sharing.
Common questions
Which is cheaper, Asta Powerproject or Merlin Project?
As of Nov 13, 2026, Merlin Project is cheaper to start with: $6.99 a month for each person, against about $170.84 a month for each person for Asta Powerproject. Asta Powerproject starts at £1,530 per licence / year, VAT included, UK shop price, and Merlin Project starts at $6.99 per user / month for the Express edition; full Mac app $22.99, iPad $9.99.
Which has a free plan, Asta Powerproject or Merlin Project?
As of Nov 13, 2026, neither Asta Powerproject nor Merlin Project has a free plan. Both have a free trial.
Which platforms do Asta Powerproject and Merlin Project run on?
As of Nov 13, 2026, only Asta Powerproject lists Windows and Android apps and only Merlin Project lists a macOS app. Both list an iOS app. A platform missing from a listing is one its maker's pages did not mention.
More comparisons
How this page was made
- The verdict at the top follows a fixed rule. When both tools are in the same category and either is in our top three for it, the verdict follows that ranking: the higher-placed tool is our pick. The top three weigh who each tool suits as well as its grades, so a pick can go against the GPA. Otherwise the page does not pick one and says which grades higher: the higher GPA first; on a tie, the one with a free plan, then the one that starts cheaper in dollars a month, counted the same way for both; if they are still level, what the choice depends on.
- The grades are our own, from each tool’s review or report card. The GPA is their average.
- Prices, plans and platforms come from each tool’s listing. The table above says where each price was read and when.
- The differences and the answers to the questions are worked out from those listings.

