Asta Powerproject vs Raken (2026): which should you pick?

As of Nov 13, 2026, Asta Powerproject grades higher than Raken: 1.8 against 1.6 out of 4.0.

Checked Nov 13, 2026 · graded Nov 13, 2026 by ToolGPA

Asta Powerproject grades higher on the free plan. They get the same grade on value for money, features, ease of use and platforms.

Price, platforms and features side by side. The table says where each price was read and when.

Asta Powerproject

Gantt-based planning software built for construction projects

Free trial · from £1,530/yr

Raken

Field reporting and time tracking app for construction crews

From $23/mo

Which one is for you

Pick Asta Powerproject if

  • Fits if you plan construction programmes and need 4D BIM links
  • Works for contractors who want a free viewer for colleagues

Look elsewhere if

  • Pricey if you are a small team, as one licence is £1,530 a year with VAT
  • Not for you if you use a Mac, as the desktop software is Windows only and Mac needs the SaaS edition
  • Watch out: the iOS and Android app is licensed separately
  • Watch out: the price read is the UK shop's in pounds, and Enterprise has no published price
  • Skip it if you want a free plan, as only a 14-day trial is listed

Pick Raken if

  • Fits if you need daily reports from a crew of 3 or more
  • Works for contractors who feed Procore or QuickBooks

Look elsewhere if

  • Skip it if you are one or two people, as the minimum is 3 users
  • Pricey if you need time tracking or safety forms, which need Performance at $59 a user
  • Not for you if you want a trial, as the pricing page mentions none
  • Watch out: plans are billed annually, and onboarding is only included on Performance

How we grade them

1.8GPAAsta PowerprojectWeak1.6GPARakenWeak
Value for money
D£1,530 per licence a year with UK VAT, about £128 a month, far above the dearest tenth of the category. It is a specialist tool, but the figure is the UK shop price.
DBasic is $23 a user with a 3-user minimum, $69 a month floor, and the useful time and safety parts sit on Performance at $59, the dearest tenth.
Free plan and trial
D14-day free trial download, no free plan, and card terms are not stated.
FNo free plan and the pricing page mentions no trial.
Features
CGantt scheduling, 4D BIM, resources, costs and scenario planning. It does the construction planning job fully, which is a narrower job than general project management.
CDaily reports on Basic. Time tracking, production tracking, safety and quality and RFIs are Performance only.
Ease of use
CNo store rating on record. Construction scheduling software takes training.
CNo store rating on record. Crews and projects have to be set up first.
Platforms and integrations
BWindows desktop with iOS and Android apps, which are licensed separately. Mac use needs the SaaS edition.
BWeb, iPhone and Android, with Procore, QuickBooks, Sage 300, Viewpoint and Dropbox links. No desktop app is listed.
Best forconstruction planners who need Gantt programmesdaily reports for contractors with a crew

The GPA is the average of the five grades: an A is 4 points, an F is none. The full reasons are on each tool's page: Asta Powerproject and Raken. How we grade

Price against what you get

Asta Powerproject starts at about $170.84 a month for each person and scores 2.3 out of 4 on features, ease of use and platforms. Raken starts at $23 a month for each person and scores 2.3.

They score the same, and Raken starts $147.84 a month lower. Of the other project management tools on the chart, 65 score higher than Asta Powerproject for less, and 59 score higher than Raken for less.

Features, ease of use and platforms, averaged

D1.0C2.0B3.0A4.0Free$1$2$5$10$20$50$100$200$500$1kMore for lessCosts more, scores moreCosts less, scores lessCosts more, scores lessAsta PowerprojectRaken

What paid plans start at, a month (each step along is roughly double) →

  • The best score at each price
  • Has a free plan
  • No free plan
The full chart of project management tools, and the best at every price

Where they differ

  • Asta Powerproject also covers Gantt & timelines.
  • Raken also covers tasks, time tracking and time clock.
In commoniOSAndroidReportsDashboards

At a glance

Asta PowerprojectRaken
PricingFree trialPaid
Starts at£1,530 per licence / year, VAT included, UK shop price$23 per user / month, billed annually, minimum 3 users
Free planNoneNone
Free trial14-day free trial downloadNone listed
Web
Windows
iOS
Android
Made byEleco Software LimitedRaken
Price read fromshop.eleco.comrakenapp.com
CheckedNov 13, 2026Nov 13, 2026

Worth knowing

Asta Powerproject

  • The desktop software runs on Windows PC; Mac use needs the SaaS edition.
  • The iOS and Android companion app is licensed separately.
  • The price read is the UK shop's GBP figure with VAT; US and other-country prices were not seen.
  • Enterprise has no published price, and licences are single-user, concurrent or SaaS.

Raken

  • Both plans have a 3-user minimum and are billed annually; the page shows 5% off at 5 users and 10% off at 10 users.
  • Time tracking, production tracking, safety and quality management, and RFIs are Performance-only.
  • Larger teams are pointed to sales for bulk discounts, and the pricing page mentions no free trial.
  • Basic does not include dedicated onboarding; Performance does.

Key features

Asta Powerproject

Gantt scheduling
Tasks are drawn and linked inside the Gantt chart for critical path analysis, with codes, calendars, resources and costs assigned there too.
4D BIM integration
The product page lists 4D BIM integration, which ties the schedule to a building model for visual planning.
Resource and cost management
Resources are allocated across projects, and planned spend is compared with actual spend to forecast costs.
Scenario planning and reporting
Scenarios are compared for profit, and dashboards and reports are produced for stakeholders.
Enterprise collaboration
Asta Enterprise lets several users work in the same programme at once, with organization-wide views of schedules, resourcing and costs.
Free ProjectViewer
Stakeholders can open a project in the free ProjectViewer without holding a licence.

Raken

Daily reports
Branded daily reports with photos, videos and attachments, plus a live daily activity feed.
Time tracking
Mobile time clock, shared kiosk mode and supervisor-led time cards, with geofencing, on the Performance plan.
Production tracking
Progress and production quantities, with equipment, material and resource scheduling tools.
Safety and quality
Managed checklists, observations, incidents with OSHA submission and a toolbox talks library.
RFIs and documents
RFIs, digital forms and document storage for project management work.
Insights dashboards
Dashboards and compliance reporting built from the field data.

Plans

Asta Powerproject

  • Annual Subscription£1,530

    per licence / year, billed annually, VAT included

    One user per licence on Windows PC, with 14-day activation support. Buying 2 licences gets 5% off. UK shop price in GBP.

  • EnterpriseCustom

    Shared real-time access to projects, shared resources and visibility across all projects; contact the team or a reseller.

Raken

  • Basic$23

    per user / month, billed annually

    Minimum 3 users. Unlimited projects, branded daily reports, photos and video, tasks, directory and messaging, and live chat and phone support.

  • Performance$59

    per user / month, billed annually

    Minimum 3 users. Adds time tracking, production tracking, safety and quality management, RFIs, forms, document storage, insights dashboards and dedicated onboarding.

Ways to pay less

Asta Powerproject

No public discounts listed.

Raken

  • Other savings

    Volume discounts on larger teams

    The pricing page shows 5% off at 5 users and 10% off at 10 users, and offers bulk discounts for larger teams through sales.

Common questions

Which is cheaper, Asta Powerproject or Raken?

As of Nov 13, 2026, Raken is cheaper to start with: $23 a month for each person, against about $170.84 a month for each person for Asta Powerproject. Asta Powerproject starts at £1,530 per licence / year, VAT included, UK shop price, and Raken starts at $23 per user / month, billed annually, minimum 3 users.

Which has a free plan, Asta Powerproject or Raken?

As of Nov 13, 2026, neither Asta Powerproject nor Raken has a free plan. Asta Powerproject has a free trial.

Which platforms do Asta Powerproject and Raken run on?

As of Nov 13, 2026, only Asta Powerproject lists a Windows app and only Raken lists a web app. Both list iOS and Android apps. A platform missing from a listing is one its maker's pages did not mention.

More comparisons

How this page was made

  • The verdict at the top follows a fixed rule. When both tools are in the same category and either is in our top three for it, the verdict follows that ranking: the higher-placed tool is our pick. The top three weigh who each tool suits as well as its grades, so a pick can go against the GPA. Otherwise the page does not pick one and says which grades higher: the higher GPA first; on a tie, the one with a free plan, then the one that starts cheaper in dollars a month, counted the same way for both; if they are still level, what the choice depends on.
  • The grades are our own, from each tool’s review or report card. The GPA is their average.
  • Prices, plans and platforms come from each tool’s listing. The table above says where each price was read and when.
  • The differences and the answers to the questions are worked out from those listings.